China, Korea and Japan: automotive cost and engineering intelligence
Know what it should cost in China.
Should-cost, supplier and engineering facts from inside China's automotive industry, with Korea and Japan covered through the same network.
MaterialsConversionScrap, logisticsMargin, stated on its own
Five services, run by one team
Each line runs on its own or feeds the others. A teardown becomes a should-cost; a supplier visit becomes a quote.

Benchmarking and should-cost
What a part should cost to make in China, and who can make it.
View service
Teardown and field verification
Vehicles and parts sourced through licensed channels, opened and checked.
View service
Engineering delivery
System proposals, design reviews and failure analysis by former OEM engineering leads.
View service
Expert advisory
Calls, interviews and workshops with people who ran China programmes.
View service
Executive benchmarking visits
Working visits to Chinese plants and suppliers, built around your questions.
View serviceWhere Novie fits in your vehicle programme
Seven points where a China fact changes the decision. Pick a stage to see the question, the service and one case.
Which China competitor sets the bar, and what's inside it?
Service: Teardown and field verification
- Challenge
- A European premium OEM needed current China models for a teardown programme.
- Solution
- Three vehicles selected against the parts in scope; trims and model years fixed before purchase.
- Result
- Teardown list narrowed before any vehicle was bought.
What would a Chinese OEM build here?
Service: Engineering delivery
- Challenge
- A premium OEM wanted a simpler front-camera ADAS option.
- Solution
- A smart-camera system with separate parking, laid against the customer's E/E architecture.
- Result
- Sensor set costed below the current architecture, item by item.
Who in China can make this, and at what cost?
Service: Supplier identification and should-cost
- Challenge
- A premium OEM needed Tier-2 wire harness sources in China.
- Solution
- Tube, tape and cable makers screened for automotive capability.
- Result
- More than 20 suppliers qualified.
Is this engineering quote right?
Service: Bottom-up should-cost
- Challenge
- A premium OEM received a software ED&T quote for three powertrain programmes.
- Solution
- Effort rebuilt from the scope and ASPICE work products before the quote was opened.
- Result
- Quoted effort challenged line by line, each with its basis.
How long should this really take?
Service: Engineering review and field checks
- Challenge
- A Tier-1 claimed a steering wheel assembly cycle time its customer doubted.
- Solution
- Checked against cycle times at a Chinese Tier-1 interiors plant.
- Result
- The claim came out 10 to 35% above China practice.
Where is the gap against China?
Service: Benchmarks and should-cost
- Challenge
- A premium OEM wanted an off-the-shelf alternative for an air suspension supply unit.
- Solution
- Five China suppliers benchmarked against the reference part.
- Result
- Benchmark adopted into the customer's own cost project.
What do Chinese OEMs do differently?
Service: Expert advisory and executive visits
- Challenge
- A German OEM group's parts division wanted to understand Chinese development speed.
- Solution
- Workshops built on first-hand OEM programme cases.
- Result
- A battery pack development case showing launch within 18 months.
Cases are anonymised. Figures are rounded to protect the client.
Five days inside China's automotive supply chain
Working visits for executive teams: plants, suppliers and test drives chosen around your programme's questions, hosted by former OEM engineering leads. Licensed agencies run the logistics, charged at cost.
See how a visit works- Day 1Arrival and market briefingExpert session on China cost structure and supplier pricing practice
- Day 2Battery cellsCell plant and pack line visit
- Day 3ElectronicsECU and camera module Tier-1 visit
- Day 4Lighting and engine partsTier-1 and Tier-2 visits
- Day 5Benchmark vehicles and debriefTest drives, dealer visit, debrief session
How a Novie number is built
The same five steps on every job, so a figure can be traced back to its source.
- 1
Scope and standards
Built from the RFQ, the ESOW, ASPICE work products and ISO 26262.
- 2
Bottom-up, before the quote
The supplier quote only enters afterwards, as a comparison column.
- 3
Two-language check
Chinese and English sources, 2024 or newer, checked separately.
- 4
Field check
The ground team confirms prices and suppliers at dealers, shops and plants.
- 5
Versioned delivery
Every table carries a version and a change log.
A small senior team, with a network on the ground
Novie's leads come from OEM engineering and procurement at Chinese and Western carmakers. Field investigators, engineers and experts in China do the checking: prices, suppliers, parts, plants. Every number is built bottom-up and confirmed before it leaves us.
Plus a bench of former OEM and Tier-1 experts across battery, ADAS, E/E, cockpit and manufacturing.
See the experts by domainAbout Novie